Protection of Finished Floor Tiles

Apr 16, 2026

Leave a message

1. Reliable protective measures must be implemented for completed interior work; floor installation must not result in wall staining, floor drain blockages, or similar issues.


2. During the installation of floor tiles, previously installed door frames and piping must be protected. Construction activities must not stain or damage the semi-finished or finished work of other trades.


3. A backing board must be used when cutting floor tiles; cutting directly on the installed flooring surface is prohibited.


4. Following the completion of the floor tile installation, the surface must be covered and cordoned off during the curing period to maintain moisture and prevent damage. Subsequent construction steps may only proceed after the cement-mortar bonding layer has reached the required design strength.


5. Mixing paint or mortar on the installed floor surface is strictly prohibited. Ladders, scaffolding, and heavy workbenches must not be placed directly on the tiled surface. The flooring surface must be covered and protected during painting or coating operations.